Project Spotlight Sheraton Four Points Hotel
Overview: Gyp-Crete® 2000 at 1" average was chosen as a topping for the precast hollow core plank for its superior leveling characteristics, strength, durability and fast drying. Durwest, a licensed trained Maxxon installation company has special pumping equipment with the ability to pump up to 20,000 sq. ft. per day. The contractor was able to walk on it in 60-90 minutes with compressive strengths up to 2000 psi. Mixed on the job site and monitored for quality control, Gyp-Crete® 2000 gives a smooth, flat surface for finished floor goods.
|