Project Spotlight

Sheraton Four Points Hotel


Gyp-Crete® 2000/3.2K

Location: 
Sheraton Four Points Hotel - Airport
Winnipeg, Manitoba

Scope: 

  • Gyp-Crete 2000/3.2K at 1" average over precast hollow core plank.
Contractor:
E.K. Construction 2000, Ltd
Maxxon Dealer:
Durwest Construction

Overview: Gyp-Crete 2000/3.2K at 1" average was chosen as a topping for the precast hollow core plank for its superior leveling characteristics, strength, durability and fast drying.

Durwest, a licensed trained Maxxon installation company has special pumping equipment with the ability to pump up to 20,000 sq. ft. per day.

The contractor was able to walk on it in 60-90 minutes with compressive strengths up to 2000 psi. Mixed on the job site and monitored for quality control, Gyp-Crete 2000/3.2K gives a smooth, flat surface for finished floor goods.