Project Spotlight

Liquor Control Board


Level-Right® Plus

Location: 
123 Market Street
Ottawa and Toronto, Ontario

Scope: 

  • 8,000 sq. ft. of Level-Right Plus.
Architects:
Crang & Boake Architects
Contractor:
BMG Enterprises, Ltd.
Maxxon Dealer:
Acoustical Floors, Ltd.

Overview: 8,000 sq. ft. of Level-Right Plus was poured in 4 hours.

 

Before the pour began the floor was shotblasted to a CP 5 profile with 390 shots. Primer was used to create a bond for the Level-Right Plus self-leveling floor underlayment.

  8,000 sq. ft. of Level-Right Plus was poured in 4 hours.
     
 

2-4 hours after the pour it was ready for sub-trades and foot traffic.

  Acoustical Floors machine which has the ability to pump up to 100 bags per hour.