Buildex

Project Spotlight

Hotel King
Gyp-Crete® 2000/3.2K

Location: 
Vancouver, British Columbia

Scope: 

  • 18,000 sq. ft. of Gyp-Crete® 2000
Architect:
Robert Turecki Architect
Contractor:
Bill's Development

Overview: Maxxon Corporation's Gyp-Crete 2000 product was chosen as a part of this particular floor / ceiling assembly for its superior strength, sound proofing qualities, durability and fast drying.

A licensed-trained Maxxon installation company applied Gyp-Crete® 2000 with special pumping equipment that has the ability to pump up to 30,000 sq. ft. per day.

Poured after drywall, the contractor was able to walk on it in 60-90 minutes with compressive strengths up to 2000 psi. Mixed on the job site and monitored for quality control, Gyp-Crete® 2000 gives a smooth, flat surface for finished floor goods.

   
         
   
         
   

Maxxon provides underlayment, Gyp-Crete, gypsum concrete and other flooring underlayment products for new construction, remodeling and renovation.
This site and all contents copyright © 2001-2011 MAXXON Inc. All rights reserved.
Privacy Policy

 Home | Canada |en français | en español