|
|
||||||||||||||||||||||||||||||
|
Project Spotlight Hotel King
Overview: Maxxon Corporation's Gyp-Crete 2000 product was chosen as a part of this particular floor / ceiling assembly for its superior strength, sound proofing qualities, durability and fast drying. A licensed-trained Maxxon installation company applied Gyp-Crete® 2000 with special pumping equipment that has the ability to pump up to 30,000 sq. ft. per day. Poured after drywall, the contractor was able to walk on it in 60-90 minutes with compressive strengths up to 2000 psi. Mixed on the job site and monitored for quality control, Gyp-Crete® 2000 gives a smooth, flat surface for finished floor goods.
|