Project Spotlight

Enbridge Power


Maxxon® DPM

Location: 
Toronto, ON
Scope: 20,000 sq ft of Maxxon DPM
General Contractor:
BNE Contractors
Kitchener, ON
Applicator:
Floor Solutions Canada, Inc.
Cambridge, ON

Overview:Enbridge Power needed to correct a moisture emission issue in the basement of their main office.  To do so, Floor Solutions Canada, Inc. installed Maxxon DPM throughout the entire area.  The floor was then finished with 16 mils of epoxy flooring.

 
Shotblast floor, ready to receive Maxxon DPM. Maxxon DPM is applied.  
 
Grey areas are saw cuts that have been filled. Area treated with Maxxon DPM.  
   
Area finished with epoxy flooring.