Project Spotlight

District Condominiums - Phase II


Gyp-Crete® 2000/3.2K, Acousti-Mat® 3 and Maxxon® CSM
Location: 
Winnipeg, MB

Scope: 32,000 sq. ft. of Gyp-Crete 2000/3.2K poured at 1-1/2" over Maxxon Moistop, Acousti-Mat 3 and Maxxon CSM
Architect:
701 Architecture Inc.
Winnipeg, MB
Contractor:
Streetside Development Corporation
Winnipeg, MB
Dealer:
Durwest Construction, Inc.
Winnipeg, MB

Overview: In phase 2 of this warehouse renovation, Acousti-Mat 3 was selected to address sound control issues presented by open beam construction. Durwest first leveled the floor by filling trenches and out-of-level areas with Gyp-Crete 2000/3.2K. Maxxon Moistop was then installed as an added precaution against water leakage. Acousti-Mat 3 and Maxxon CSM were installed over the Moistop and then topped with 1-1/2” of Gyp-Crete 2000/3.2K. Not only did this system add sound control and fire safety, it provided a smooth surface perfect for a variety of finished floor goods.